Well Control Systems

In VTC we are a team that is passionate about safety, we verify that your well control system and equipment,are according to relevant mandatory requirements and standards. VTC Offshore assist in improving your well control safety standards.

VTC Offshore offers complete verification services or custom made survey to ensure the reliability, performance and compliance of your well control equipment. We specialize in verifying critical aspects of the BOP system to ensure its readiness for the planned operation/use of the well control equipment.    

Below are examples our areas covered by expertise:

Maintenance Compliance: Our experts assess the maintenance of your well control system against applicable requirements. This includes valves, piping, thickness measurement, pressure and temperature gauges, and pressure testing.

Accumulator Capacity and Response Time: We verify the accumulator volumetric capacity, pressure requirements, and BOP response time to ensure their effectiveness in maintaining control under high-pressure scenarios.

Recorded Maintenance Data: We review the system's ability to record corrective maintenance jobs and failed tests, creating a feedback loop for continuous improvement and enhanced safety.

Acceptance Testing : Our team conducts acceptance testing prior to operation on behalf of operator to ensure that the system is ready for operation and according to existing test procedures.

Certificates: We verify the availability and validity of certificates and inspection reports for relevant BOP and other well control components ensuring regulatory compliance, i.e., COC / 5 yearly overhaul/recertification.

Control Panel Evaluation: We assess the BOP control panels and verify functionality, testing, maintenance and integration with the overall system.

Remote Control Systems: We verify choke/kill and diverter system/panels to ensure optimal response, function and accuracy.

Shear Ram Capability: We verify that the BOP has been tested, or been verified by other means for it's cutting capability on relevant drill string components/ other required tubulars, ensuring readiness for planned operations.

HP/HT operations: Our experts assist our customers evaluating and verifying, specific requirements, according to relevant regulations/requirements and customers specifications.

Emergency Training: We verify that emergency training and drills for your drilling personnel, covering vital scenarios such as kick drills, pit drills, and choke drills.

Line-Up Training: Our surveyors verify the emergency line-up procedures, ie.: pump room, cement unit, overboard lines, diverter, kill/choke manifold, BOP outlets, etc.

VTC Offshore offers complete verification services or custom made survey to ensure the reliability, performance and compliance of your well control equipment. We specialize in verifying critical aspects of the BOP system to ensure its readiness for the planned operation/use of the well control equipment.    

Below are examples our areas covered by expertise:

Maintenance Compliance: Our experts assess the maintenance of your well control system against applicable requirements. This includes valves, piping, thickness measurement, pressure and temperature gauges, and pressure testing.

Accumulator Capacity and Response Time: We verify the accumulator volumetric capacity, pressure requirements, and BOP response time to ensure their effectiveness in maintaining control under high-pressure scenarios.

Recorded Maintenance Data: We review the system's ability to record corrective maintenance jobs and failed tests, creating a feedback loop for continuous improvement and enhanced safety.

Acceptance Testing : Our team conducts acceptance testing prior to operation on behalf of operator to ensure that the system is ready for operation and according to existing test procedures.

Certificates: We verify the availability and validity of certificates and inspection reports for relevant BOP and other well control components ensuring regulatory compliance, i.e., COC / 5 yearly overhaul/recertification.

Control Panel Evaluation: We assess the BOP control panels and verify functionality, testing, maintenance and integration with the overall system.

Remote Control Systems: We verify choke/kill and diverter system/panels to ensure optimal response, function and accuracy.

Shear Ram Capability: We verify that the BOP has been tested, or been verified by other means for it's cutting capability on relevant drill string components/ other required tubulars, ensuring readiness for planned operations.

HP/HT operations: Our experts assist our customers evaluating and verifying, specific requirements, according to relevant regulations/requirements and customers specifications.

Emergency Training: We verify that emergency training and drills for your drilling personnel, covering vital scenarios such as kick drills, pit drills, and choke drills.

Line-Up Training: Our surveyors verify the emergency line-up procedures, ie.: pump room, cement unit, overboard lines, diverter, kill/choke manifold, BOP outlets, etc.

Geir Gorm Olsen
Geir Gorm Olsen
Managing Director
ggo@vtcoffshore.no
About
Henry Meling
Senior Subsea Advisor
M:
heme@vtcoffshore.no
About

More services within

Rig Intake & Verifications
By clicking «Accept», you agree to the storing of cookies on your device to enhance site navigation and analyze site usage, in order to improve site user experience. You can choose which cookies we can store via Preferences. View our Privacy Policy for more information.